Home / Capabilities / Assembly
Process — Assembly
Where the pieces become the product. Components are fit-up checked, assembled to the approved shop drawings, and coordinated as complete units — so what arrives on site goes together right, first time.
A project is only as good as it goes together — precise parts still need precise assembly to read as one seamless piece on site.
Cut, formed and finished components are assembled to the approved shop drawings, with a fit-up check before final joining so geometry and alignment are confirmed before anything becomes permanent.
Complex, multi-part elements are trial-assembled and coordinated as complete units, so tolerances stack correctly and installation on site is fast, predictable and clean.
What we do
Dry-fit, build, check — before anything reaches site.
Parts are dry-fitted and checked against the drawings before any final joining is committed.
Units are built to the approved shop drawings — alignment, spacing and geometry confirmed.
Welded, bolted or concealed fixings as the design requires, executed cleanly.
Complete assemblies are checked as units before packing, so site work is predictable.
Why it matters
Fit-up checks catch issues in the workshop, not on site where they cost time.
Multi-part elements read as one continuous piece, not a collection of parts.
Stack-up is coordinated across components so everything lines up at installation.
Pre-assembled, checked units make site work quick and predictable.
Assembly is handled to protect polished and coated surfaces through to delivery.
Built to the approved shop drawings — what's signed off is what's delivered.
How we control it
Confidence on site comes from verifying fit and protecting the finish before anything leaves the workshop.
Geometry and alignment are confirmed by dry fit-up before anything is permanent.
Assemblies follow the signed-off shop drawings — the single source of truth.
Finished surfaces are protected during assembly to stay mark-free.
Complete units are checked before packing and dispatch.
Good to know
| Scope | Workshop assembly of cut, formed and finished components into complete units. |
| Reference | Built to the approved shop drawings with fit-up verification. |
| Joining | Welded, bolted and concealed fixings as the design requires. |
| Coordination | Multi-part elements trial-assembled and tolerance-coordinated. |
| Handover | Pre-delivery check, then protected packing for site (see The System). |
| On site | Pre-assembled units for fast, clean installation. |
Where it's used
Pre-assembled cladding modules for fast facade installation.
Coordinated handrail and balustrade sections.
Fully assembled bespoke metal furniture pieces.
Multi-panel mashrabiya and partition assemblies.
Built-up signage bodies ready to mount.
Complex feature elements assembled as single units.
Start a project
Share your assembly and installation drawings — we'll coordinate fit-up and pre-assembly, and prepare a tailored quotation.